To meet specific application requirement, we need to develop the part as per customized specification. To design & develop the same following parameters are need to be considered;
1) Install the Neoprene sealing sleeve on one end of the pipe or fitting.
2) Place the stainless-steel shield over the other end to be joined.
3) Insert both ends into the sealing sleeve until they fix against the moulded centre stop, inside the sleeve.
4) Centre the shield over the sealing sleeve and tighten as directed below.
V-Band clamp’s method of operation is based on principle of inclined plan (Wedging action). When the closure bolt is tightened, this exerts radial force on the V-profile segments. The two halves of the flange are pressed axially together by means of the V-Petal wedging action (see diagram below). The radial force that is exerted is converted into considerably higher axial force.